South Louisiana midstream client
Fabrication and construction for installation of cold gas separators and heat exchangers
Man hours: 20,000
Duration: 4 Months
South Louisiana midstream client
Fabrication, installation, coatings and instrumentation and electrical work for cooler expansion, civil preparation and interconnect piping.
Man hours: 120,000
Duration: 14 Months
Permian Basin major operator
Installed cathodic protection cathodes and anodes to update current system and performed maintenance coatings to areas of coating failure and rust break out on upon completion of cathodic protection system update.
Duration: 2 Months
Gulf of Mexico major operator
Plug and abandonment campaign support
Man hours: 135,000
Duration: 24 months
Gulf of Mexico major operator
Plug and abandonment campaign support
Duration: 36 months
South Texas midstream client
Onshore installation of three new ethane booster pump stations and one new metering station with launcher / receiver package.
Man hours: 50,000
Duration: 7 Months
Offshore Gulf of Mexico
Fabrication, installation, coatings and shore base support on facility upgrade to bring project to full compliance.
Man Hours: 180,000
Duration: 15 months
Deepwater Gulf of Mexico major operator
Topsides completion and hook up and commissioning of new production platform
Man hours: 600,000
Duration: 12 months
Onshore operations
Automation systems integration - design, fabrication, integraiton, installation and commissioning of new plan control system equipment
Duration: 2 weeks
South Louisiana midstream client
Installation of two 400HP pumps and power distribution center building. Provided associated civil work, fabrication, piping installation, electrical hook up and final commissioning.
Man hours: 20,000
Duration: 4 Months
Onshore Permian Basin operator
Installation and construction of 5,000 barrel hydrocarbon storage transfer facility with water transfer pumps, LACT oil metering system and gas injection facility
Duration: 6 months
New facility Instrumentation and electrical
South Louisiana midstream client
Project management, pre-commissioning, commissioning and complete instrumentation and electrical installation, MV, LV, PLC and communications
Duration: 13 months
Deep water Gulf of Mexico major operator
Initial project management and support of work pack development for offshore scope of over 75,000 SQFT of hull column rehabilitation painting and 25,000 SQFT of deck
Man hours: 41,000
Duration: 8 Months
Deep water Gulf of Mexico major operator
Initial Project Management and support of work pack development for offshore scope of over 50,000 SQFT of hull column rehabilitation painting.
Man hours: 26,500
Duration: 4 Months
North Carolina midstream client
Assembled and erected a new 110' vent stack, power and controls to CO2 snuffing system unit
Duration: 5 months
Onshore Permian Basin
Construct, build and re-build public saltwater disposal injection and storage facility.
Duration: 2 months
Offshore Gulf of Mexico major operator
Fabrication, construction, and installation of skids, interconnect piping and deck extension.
Man hours: 70,000
Duration: 8 Months
South Louisiana midstream client
Onshore repair and protective coating of slug catcher piping.
Man hours: 20,000
Duration: 3 Months
South Louisiana midstream client
Slug catcher repair, facility upgrades and maintenance
Duration: 9 months
Uninterrupted chemical flow
Accurate injection rates
Efficient use of stored power = reduced power failures
Injection rates of up to 100 gallons per day
Injection pressures up to 2,500 PSI
For more information contact Mike White 985-219-3930